A two-stage scheduling method for hot rolling and its application
发表时间:2019-03-09
点击次数:
论文类型:期刊论文
第一作者:Zhao, Jun
通讯作者:Zhao, J (reprint author), Dalian Univ Technol, Res Ctr Informat & Control, Dalian 116024, Peoples R China.
合写作者:Wang, Wei,Liu, Quanli,Wang, Zhigang,Shi, Peng
发表时间:2009-06-01
发表刊物:CONTROL ENGINEERING PRACTICE
收录刊物:SCIE、EI
文献类型:J
卷号:17
期号:6
页面范围:629-641
ISSN号:0967-0661
关键字:Hot rolling production scheduling; Vehicle routing problem with time
windows; Heuristics; Intelligent search algorithms
摘要:Hot rolling scheduling is a difficult problem in the steel processing industry. It involves many objectives and constraints in both technical and practical respects. A two-stage scheduling method is proposed in this paper. Batch planning of staple material is formulated as a VRPTW, which is solved with a modified PGA. Then, batches of the established units are optimized by adjusting rolling sequences using intelligent search algorithms to reach higher hot charge ratios. This method has been applied to a hot strip mill belonging to Baosteel in China. Our results demonstrate that the proposed technique can improve production efficiency and offer significant economic benefits. (C) 2008 Elsevier Ltd. All rights reserved.
是否译文:否